A ledger of removals. The listed-SME wave, sector standards and reasonable assurance are gone. Wave 1's obligations, the scope 3 duty and the supplier questionnaire are not.

In short

  • The removals are real and permanent: the listed-SME wave, its standard, sector-specific standards and the route to reasonable assurance were deleted, not delayed.
  • The first reporting wave received no stop-the-clock. Its window was closed forward to financial years starting by 31 December 2026, and relief for 2025 and 2026 is a Member State option.
  • Nothing was taken away from the demand side. Reporters still need scope 3 from suppliers, so the questionnaire survived its own regulation.

Omnibus I is Directive (EU) 2026/470, in force since 18 March 2026. It binds Member States, which have until 19 March 2027 to transpose it, so what reaches a company is national law rather than the directive itself. Read as a ledger, it removed four things permanently and left three things that people assume went with them. Gone: the listed-SME wave, the listed-SME standard, sector-specific ESRS and the route to reasonable assurance. Still here: the first wave's completed obligations, the scope 3 duty for anyone still in scope, and the supplier questionnaire. If you are planning around a removal, check which column it is in first.

The distinction matters commercially. A deleted empowerment does not come back without new legislation. A closed window still has obligations inside it. And a duty that survives on the reporter's side turns into a request on yours.

What was removed permanently?

Four items, each a deletion in the enacted text rather than a change of date.

The listed-SME wave. Point (c) of the first and third subparagraphs of Article 5(2) of Directive (EU) 2022/2464 was struck out. Recital 21 says the directive excludes small and medium-sized undertakings whose securities are admitted to trading on a regulated market in the Union from the sustainability reporting regime. Not later. Excluded.

The listed-SME standard. Article 29c of the Accounting Directive, the empowerment that would have produced a lighter standard for that wave, went with it. There is now no separate mandatory standard for smaller listed companies and nothing empowering the Commission to write one.

Sector-specific ESRS. The third subparagraph of Article 29b(1) contained both the power to adopt sector standards and a requirement to produce a first set by 30 June 2026. Both were deleted. Recital 20 gives the reason as keeping the number of prescribed datapoints down. The Commission can still publish non-binding sector guidance, and no date is attached to that.

Reasonable assurance. The empowerment in Article 26a(3) of Directive 2006/43/EC to adopt reasonable assurance standards by 1 October 2028 was removed, on the stated ground of avoiding higher assurance costs. Limited assurance is not a stage on the way to something firmer any more. It is the regime.

What survived that people assume did not?

Six assumptions, and each one costs money to get wrong.

Often assumed goneActual position
Wave 1 got a stop-the-clockIt did not. Its window was closed forward to financial years starting between 1 January 2024 and 31 December 2026
Everyone below the new thresholds was released for 2025 and 2026Only if their Member State took up the option. It is a discretion, not an exemption
Scope 3 reporting was droppedIt was not. Reporters still disclose each significant scope 3 category
Supplier questionnaires stopThey do not. Reporters need value chain data and will keep asking for it
The Taxonomy narrowed independentlyIt has no scope of its own. It follows Articles 19a and 29a by reference
Assurance was removedIt was not. A limited assurance opinion is still required

Did companies already reporting get let off?

No, and this is the single most consequential misreading in circulation.

The earlier stop-the-clock directive, (EU) 2025/794 of 14 April 2025, postponed the second and third waves by two years. It did not touch the first one. Omnibus I then rewrote the first wave's window so that it runs for financial years starting between 1 January 2024 and 31 December 2026, which closes it going forward rather than reopening what has passed.

Between those poles sits an option. For financial years starting between 1 January 2025 and 31 December 2026, Member States may exempt undertakings that do not exceed the new figures. May, not must. So whether a given company had to file for financial year 2025 depends on which country it reports in, and two identically sized companies can have opposite answers. Do not take a national position from a vendor page, this one included, without checking that country's transposing law.

Did it take away the demand for your data?

It did the opposite of that, and this is where the ledger stops being reassuring for suppliers.

An undertaking still inside Articles 19a and 29a has to report value chain information and has to disclose each significant scope 3 category. Where it cannot collect that information after reasonable effort, ESRS 1 tells it to estimate using reasonable and supportable information such as sector-average data and other proxies. So the reporter has three options: get real data from you, estimate you, or both. Estimation is cheaper for them and worse for you, because a sector average tends to flatter no one.

What Omnibus I did add on your side is a ceiling. A supplier that does not exceed an average of 1,000 employees, sitting in a reporter's value chain, may decline to provide information exceeding the voluntary standards where the request is made for CSRD reporting. A contract clause overriding that is not binding, and the customer has to tell you which parts of a request go beyond the ceiling. It does not touch procurement scoring, due diligence or risk management questions, which is where many questionnaires come from. The voluntary standards that set the ceiling were published as Delegated Regulation (EU) 2026/1560 on 21 September 2026 and apply from financial years beginning on or after 1 January 2027. The detail is in what a customer may not ask you.

Was anything taken away from the assurance file?

The ceiling was lowered and the timetable slipped, but the obligation is intact.

A limited assurance opinion is still required under Article 34(1), second subparagraph, point (aa) of the Accounting Directive, covering compliance with the ESRS, the process used to identify what was reported, the machine readable markup and the Article 8 Taxonomy disclosures. What changed is that the harmonised limited assurance standards are now due from the Commission by 1 July 2027 rather than 1 October 2026, so engagements before that date run on national standards, and the practical bar varies by country in the meantime.

What should replace what was taken away?

If you lost an obligation, replace it with a decision rather than nothing.

Companies that fell out of scope still face customers, lenders and tender scorers who did not. The sensible replacement for a deleted reporting duty is a repeatable inventory sized to the voluntary standard rather than the full ESRS, which is what the VSME standard sets out. Start it on a free account on the platform, which serves 5,000+ users, and see what your own systems already support.

Companies still in scope lost a sector standard they may have been waiting for. That waiting was the cost. Nothing prescribes a sector method now, so the pragmatic move is to build to the general standard and treat sector guidance as commentary if it ever appears. CSRD consulting covers that decision.

One limit worth stating. Hedgehog has few integrations with other software today, and a mid-market reviewer who rated Hedgehog 5 out of 5 on G2 in June 2026 still asked for more. If your plan depends on data flowing automatically out of an ERP, ask us about your specific system before you assume it.

Sources: Directive (EU) 2026/470 of 24 February 2026, Directive (EU) 2025/794 of 14 April 2025, Directive (EU) 2022/2464, Directive 2013/34/EU, Directive 2006/43/EC, Delegated Regulation (EU) 2023/2772 and Delegated Regulation (EU) 2026/1560, read against the Official Journal text. Verified 22 November 2026. 2026/470 is a directive, so national transposition sets the date each removal takes effect in your country.

Facts on this page were last verified on 2026-11-22.

Frequently asked questions

No items found.
Start free version on Hedgehog Carbon Platform
Start free version on Hedgehog Carbon Platform
Start for free

Start free version on Hedgehog Carbon Platform

Start your carbon footprint with the free version of our Hedgehog Carbon Platform

This article is written by:
Joost
Joost
Co-Founder
Send emailLinkedInBook a meeting

Get in touch

Whether you are a large or small business, a start-up or a company with a long history, offering a product, process, or service, we respond swiftly and support you in taking your next step.